随着国民经济不断增长,科学技术不断进步,土木工程行业发展得到质的飞跃.招投标作为土木工程建设管理过程的重中之重,是一项必不可缺的关键内容,直接关系到土木工程的施工质量和效率,确保我国工程建设行业稳定持续发展。下面是土木工程招投标论文6篇,供大家参考阅读。
土木工程招投标论文第一篇:土木工程招标投标制度的发展研究
摘要:阐述招标投标制度实施的必要性, 分析土木工程招标投标中存在的主要问题, 对完善土木工程招标投标制度的有效策略展开探讨, 旨在为研究如何促进土木工程招标投标的有序开展提供思路。
关键词:土木工程; 招标; 投标; 制度;
Research on the development of civil engineering tendering and bidding system
LI Xiao-wei ZHAO Na-na
Tongda College, Nanjing University of Posts and Telecommunications
Abstract:This paper expounds the necessity of the implementation of the bidding and tendering system, analyses the main problems existing in the bidding and tendering of civil engineering, and explores the effective strategies for improving the bidding and tendering system of civil engineering, aiming at providing ideas for the study of how to promote the orderly development of the bidding and tendering of civil engineering.
1 招标投标制度实施的必要性
招标投标制度实施有助于降低土木工程建设成本, 有助于提高所投入资金的有效利用率, 还有助于制约各式各样的违法犯罪行为。实施土木工程的招标投标可缩减社会平均劳动消耗水平, 实现对工程成本的有效控制, 使土木工程建设成本进一步趋于合理化。严格落实土木工程招标投标制度, 可促进土木工程建设市场中招标人与投标人的自由选择, 投标人的自由竞争, 进一步促进形成良性竞争的局面, 缩减成本, 提高生产效率;严格落实土木工程招标投标制度还可促进规范价格行为, 实施招标投标制度是反映土木工程市场定价的一项价格体制, 而实施该制度最显着的表现即为投标人相互间产生激烈且正当的竞争行为, 而该种积极的市场竞争, 其在价格竞争层面可得到直观体现, 而在价格竞争过程中, 形成良性的循环, 可进一步缩减工程价格, 促进提高投资效益[1]。
2 土木工程招标投标中存在的主要问题
2.1 土木工程招标中的问题
其一, 未制定科学完备的工程量清单及土木工程技术规范说明书。工程量清单是土木工程招标人提供在土木工程招标文件中, 依据实际工程量计算方式对土木工程各个建设部分开展计算, 并将各个分项工程量罗列出来的详细清单。作为招标文件中必不可少的一部分, 工程量清单不仅可为招标人在编制工程制价过程中提供有力依据, 还可通过对土木工程的全面划分, 为投标人在竞价过程中提供有效参考, 并促进专家人员开展评审。现阶段, 我国工程量清单编制能力较为有限, 受设计图纸不详细、标注不明确、项目特征描述不清等影响, 往往会使中标人与业主相互间引发纠纷, 使业主面临极大的投资风险。
其二, 存在标底招标的不足。通常而言, 在招标过程中标底严格保密, 不对外公布, 作为招标人对工程造价的期望值, 标底并非招标文件的组成部分, 而是提供给业主在评标过程中参考使用的。然而, 标底的出现会使得大多数投标单位试图获取标底, 以确保自身报价尽可能接近底价而中标, 显然这会助长“不正之风”。
其三, 招标文件评标办法不合理。我国部分地区尚未构建起一套科学完备的评标办法, 仅仅是以招标人资格审查获准后, 然后以招标报价在评价基准值以上为前提, 筛选投标报价相对低的若干名投标人, 并由低到高逐一筛选出中标候选人。一些中小型城市存在专业化人才不足、评标专家库专家综合素质偏低的问题, 由此对评价质量造成不利影响, 进而影响土木工程招投标工作的有序发展。
2.2 土木工程投标中的问题
其一, 投标人违法投标。投标人可得到土木工程项目与否, 很大程度上影响着企业的生产, 因而受利益驱使, 一些投标人会借助不当手段进行投标, 对招投标市场有序运行造成不利影响, 更有甚者会出现不法行为, 诸如投标单位相互间事先串通, 损害招标人利益, 还有一些投标单位相互间达成协议, 轮流中标或利用资质展开围标、串标, 使招标投标作用难以得到有效发挥, 对招投标市场发展造成不利影响。
其二, 投标人投标缺乏目的性。一些投标单位在得到投标信息后, 未制定科学合理的投标对策, 缺乏对招标文件的深入分析, 未透彻研究招标文件中涉及的资质条件、技术要求、质量要求、施工期限等内容, 投标行为不够针对, 导致难以中标。还有一些投标单位故意低价中标后, 在土木工程施工中通过种种手段要求业主追加预算, 或者故意拖延工期, 以达到变更工程追加投资, 加大利润空间的目的。还有一些中标单位中标后擅自将工程项目转包、分包给不具备资质的施工单位。
3 完善土木工程招标投标制度的有效策略
3.1 推行招标人终身负责制, 解决虚假招标问题
当前招标人与工程项目不存在实际利益关系, 因而在招标过程中工程质量的优劣及建设价格均与招标人无关, 招标人员仅负责招标该项工作, 从而给施工方创造了进行不法行为的机会。招标可靠性不足, 虚假招标屡见不鲜, 而上述情况还存在进一步发展的趋势。为了切实解决此方面问题, 对于招标人、负责人而言, 可尝试对工程质量推行终身负责制。如此一来, 可制约虚假招标的出现, 对于在设计使用年限中的土木工程, 倘若在设计、结构设计等方面出现相关问题, 则应追究设计方的责任;倘若土木工程质量方面出现相关问题, 则应追究施工方、监理方的责任, 尤其是追究项目经理及项目组相关人员的责任, 如此必然可实现对招投标过程中虚假现象的有效控制, 并切实杜绝土木工程中的腐败现象, 确保土木工程的质量[2]。
3.2 构建健全招投标管理制度
为构建招投标规章制度, 营造良好的招投标市场环境。首先, 应完善评标方式方法。现阶段, 我国在实际招标中评标方法不完善, 未构建独立的评标方法, 在实际评标中太过关注价格, 而缺乏对质量的有效重视。在实际评标中, 不仅要关注价格的高低, 还应提高对质量、安全等方面的关注度, 促进土木工程项目的有序开展。其次, 提高代理招标流程的规范性。提高进场交易的规范性, 将各工程项目均纳入有形建筑市场交易。依托打造有形市场, 整治土木工程市场中的混乱现象, 并促进形成良性竞争的局面, 打破地域及行业保护格局, 有效减少串标、陪标等现象。在实际招投标制度管理中, 还应构建一套健全的监管制度, 针对招投标中存在的一系列问题, 广大企业、群众可及时反映, 开展针对整改, 进一步促进土木工程招投标工作的有序开展[3]。
3.3 有效发挥招标投标管理机构的宏观管理职能
首先, 严格依据法定职权及程序, 对招标投标活动开展全面环节的监督管理。与此同时, 尤其要加大对招标公告公布、评标办法制定等的监督管理力度, 坚决杜绝政府部门、个人对招标投标活动进行干预, 防止腐败现象的发生[4]。其次, 配合相关执法部门开展执法检查, 加大执法力度。推进市场主体不良行为与评标工作的有效结合, 以实现对失信者的有效制约;同时, 依托设置投诉举报查处招标投标中违法不当行为, 达到监督管理的目的。通过执法检查对违反制度、破坏制度的行为予以及时发现与改进, 督促主管部门加大管理力度, 使土木工程招标投标活动越来越规范, 真正意义上确保土木工程建设的综合效益。
4 结语
土木工程招标投标制度对于构建现代企业制度, 促进建筑交易市场秩序趋向于规范化、法制化, 不断提高土木工程招标投标工作质量、效率, 可起到至关重要的作用。现阶段, 我国土木工程招投标制度还有待进一步完善, 因而, 我国土木工程招投标相关人员务必要不断钻研研究、总结经验, 提高对招标投标制度实施必要性的有效认识, 加强对土木工程招标投标中主要问题的深入分析, 使我国土木工程招投标更能适应市场要求, 使土木工程招标投标工作能够顺利开展。
参考文献
[1] 布小虎.土木工程招标投标制度的发展与反思[J].工程技术 (引文版) , 2016, 09 (02) :122.
[2] 张顺, 许生福.土木工程招投标管理过程中存在的问题和对策[J].房地产导刊, 2017, 11 (09) :190-191.
[3] 邹朝霞, 刘琦娟, 林南京.关于工程项目招投标制度规范化探析[J].青年科学 (教师版) , 2014, 35 (07) :236-237.
[4] 刘逸.我国建筑工程招投标中存在的问题及对策[J].房地产导刊, 2016, 16 (21) :162-163.
土木工程招投标论文第二篇:运筹学在土木工程招投标中的应用
摘要:分析运筹学在土木工程招投标中的应用, 主要是为了明确运筹学在土木构成招投标中的应用情况及作用。目前, 我国经济繁荣发展, 土木工程项目不断增多。从某种角度而言, 对土木工程招投标进行合理的管控, 对土木工程的全面发展有重要影响。基于此, 运筹学被广泛应用到土木工程招投标中。论文在研究中, 对运筹学和土木工程招投标进行分析, 并重点研究土木工程投标报价的单价优化。
关键词:运筹学; 土木工程; 招投标;
The Application of Operations Research in Civil Engineering Bidding
ZHENG Yong-he
China Railway Major Bridge Engineering Bureau Group Co. Ltd.
Abstract:The application of Operational Research in civil engineering bidding is mainly to clarify the application and role of operational research in civil engineering bidding. At present, China's economy is developing rapidly, and the number of civil engineering projects is increasing. From a certain point of view, reasonable management and control of civil engineering bidding has an important impact on the overall development of civil engineering. Based on this, Operational Research is widely applied to civil engineering bidding. The paper analyzes Operational Research and civil engineering bidding, and focuses on the unit price optimization of civil engineering bidding.
1 引言
在城市进程加快的形势下, 土木工程建筑项目的数量不断增多。在土木工程建筑项目中, 招投标是非常重要的环节。通常情况下, 投标实践中的报价, 是土木工程中标率的重要影响因素, 据业内人士估计, 报价在土木工程评价指标中的比重至少占有60%。因此, 从报价角度展开对土木工程招投标的分析有重要意义。
2 运筹学与土木工程招投标
2.1 运筹学
运筹学是一项基础课程, 作为现代管理学的重要内容, 其在现代社会中具有重要的作用。运筹学起源于上世纪30年代初, 属于新兴学科[1], 并且是跨领域性学科, 容纳和概括了形式科学和数学。在发展中, 其主要是通过对数学模型、算法和统计学等相关内容的利用, 针对复杂问题提出比较具体与合理的答案。运筹学的基础知识涵盖内容较多, 包括算法基础、离散数学等。同时, 在当前社会各领域中均有所应用, 如物流领域、数学领域、工程领域等[2]。该学科的出现和应用基于为管理者提供科学的指导, 使其在做决策时具有科学性与合理性。
2.2 土木工程招投标
近年来, 城市进程的加快, 在一定程度上促进了土木工程的发展[3]。工程招标的主体为建设单位, 根据拟建的工程项目情况, 吸引建设项目承包单位对拟建项目进行承包施工。投标是相对招标而言的, 一般来说, 投标单位参与投标竞争时, 有相应的条件, 需要符合足够的资质条件才能参与投标, 如企业规模、经济基础等, 同时要在工程交易方面有较好的业绩。在公开招标中, 参与投标的企业单位不能少于3家。投标期间, 投标书需要按照国家招标相关文件的规定, 在规定时间内递交投标书。
3 土木工程招投标报价的单价优化
3.1 招投标的报价决策
实际上, 国际建筑承包市场中很早就开始使用招投标方式进行交易[4]。在土木工程建筑领域中, 招投标对降低工程施工整体成本和提高整体施工质量有重要的影响。虽然, 对于竞争力较弱的承包商, 土木工程招投标限制了其对工程的选择, 但是, 招投标方式为整体建筑行业提供了更加公平公正的市场环境。通常情况下, 土木工程招标形式包括4种形式:公开招标、邀请招标、议标以及单一来源采购。对于已经包含的投标信息可以直接利用, 对于没有包含在内的投标信息, 可以通过市场调研等方式进行获取。例如, 调查招投标项目中需要的材料的价格、设备费用、人工费用标准等。此类信息都是影响土木工程投标估价的重要因素。
3.2 土木工程单价优化模型
报价的最终目的是中标[5]。实际上, 多数投标企业在分析报价时, 均未基于工程单价进行考虑, 缺少对单价的调整, 极大程度上限制了投标的科学性。为此, 分析土木工程投标报价时, 应基于其单价优化模型展开分析。
如图1所示为单价优化模型示意图。其中, i为支付期;li为支付期内的工程量;Bi为支付期内所列的常规费用计划;xi为通常情况下考虑的单价调整幅度;qi (li+mi) 为常规费用计划下分项工程总量;qili为常规费用计划下分项工程量;qi ki为支付期内分项工程量。其中, 下角标i为支付期;mi为工程计数;ki为支付期i内分项工程的数目;wi (li+mi) 为支付期内分项工程总量的单价;wiki为支付期内分项工程单价;yili为支付期内分项工程工程项目数目单价;zi (li+mi) 为支付期内分项工程单价的调整;为支付期内分项工程计数的单价调整。
图1 单价优化模型示意图
根据图1中的常规费用计划, 可以有效判断工程的常规报价。其常规报价计算公式为:
式中, N为土木工程投标进度款支付的总期数;j为折现率;qij为工程项目第个风向工程量;wij为常规分项工程单价;B为支付期内所列的常规报价。由此可以看出, 投标企业应以自己的投标估价为基础, 结合其在投标竞争中对未来预期利润值的分析, 从科学的角度完成对标价的确定。
4 结语
近年来, 在诸多因素的影响下, 部分土木工程招投标存在一些问题, 极大地影响了土木工程建筑项目的发展。因此, 本文展开了相应的探讨。通过对运筹学相关内容的了解, 将其应用到土木工程招投标中。同时, 从招投标的报价决策分析、土木工程单价优化模型分析方面, 重点研究土木工程投标报价的单价优化探讨。希望在本次关于运筹学、土木工程招投标相关内容的探讨, 为日后促进土木工程的发展, 奠定基础。
参考文献
[1]吴贤国, 张立茂.工程管理专业研究生运筹学教学方法探讨[J].高等建筑教育, 2014, 23 (3) :97-99.
[2]潘晓明, 卢伟宏.工业工程专业运筹学课程的改革与创新[J].现代交际, 2013, 5 (9) :206-207.
[3]叶鸿.工程教育专业认证背景下运筹学课程教学改革研究[J].物流工程与管理, 2015, 3 (11) :299-301.
[4]张玉岩, 闻佳, 赵爽, 等.工程造价专业运筹学教学研究[J].湖北函授大学学报, 2017, 30 (12) :114-115.
[5]杨静萍, 王万雷, 魏莉, 等.实践导向型工业工程专业运筹学课程体系研究[J].科学技术创新, 2015, 4 (10) :117-118.
工程招投标在我国土木工程建设行业中占据重要地位, 要想充分发挥招投标作用, 最大化缩减工程造价成本支出, 帮助工程建设企业创造更多社会效益与经济效益, 并有效保障土木工程项目的施工质量, 必须加强对招投标工作的监督管理。...
受土木工程构造、造价理念、信息化建设等方面要素的影响,当前造价控制管理实践中依旧存在诸多不容忽视的薄弱问题,阻碍着土木工程整体效益的优化提升。...
本文对数字化管理在建筑工程招投标中的应用方向和作用进行了探讨, 希望能为以后建筑工程招投标工作数字化管理的运用提供借鉴。...
建筑项目投标人应该按照流程准备相应文件参与建筑项目的竞争,并且投标一方的工作经验、资历、企业经济状况应与准备文件吻合,要保证项目实施过程中物力、人力充足,可以保证建筑工程项目能够顺利实施。...
作为招标投标的各方,非常有必要对建筑行业招投标的相关知识进行了解,以防止一些不必要的疏忽而导致失去中标机会,本文整理了6篇优秀的“建筑工程招投标管理论文”...
虽然中国的土木工程建设始终处于迅速发展的状态,尤其是近些年,伴随高速道路、铁路、高层建筑等各项工程的创建,使其领域更加完善,而且更多的现代化建材和新技术的使用也让土木工程建设更加符合当今社会进步的需要,可是就现今的城市进步状况来看,一些土...
土木工程建设是一个非常巨大、复杂的工程,需要投入使用的人力资源、机械装备、施工材料、工程资金都是大量的。土木工程当中的项目是多样的,需要根据其不同的工程项目来进行施工管理,只有具体情况具体分析,才能使工程建设顺利完成、工程质量、工程建设企...
对于施工机械的管理,首先应根据施工任务的实际情况,选择合适的施工机械或设备进行组装、安装、使用和维护。其次,在施工使用过程中,对于机械设备与施工内容的关系进行相应的协调处理,将优势资源进行优化组合,保证施工机械设备能够正常维持施工进度。...
一、建筑工程招标投标制度的研究背景国际上通用的一种科学合理的承发包方式就是采用招投标进行建筑工程项目的承发包发达国家和国际金融组织普遍采用的一种方法就是工程招投标/特殊商品0是指建设工程,包括建设工程咨询和建设工程实施而招投标,在国际社会已经...
本文就立足于当下实际情况,对土木工程施工管理中出现的问题与不足进行剖析,并给出具体的可行性解决措施。...